Power Plant Case Study

Challenges of Coal base Thermal Plants operating in India

Shared by Mr. D Nandi, NTPC Ltd..

Case Snapshot
8.0
Rating
1
Ratings
0
Comments
1
File
Case Study Details

Problem, evidence, analysis and learning

Across the Globe Coal fired Plants used to be treated as base load Power Stations. This means that these Plants will be operated at rated load on continuous basis with very little variation in Load. Coal Plants in India were not exception to that. But with the implementation of Stringent Environment parameters and large scale integration of Grid connected PV Solar Plant, the base load tag of Coal fired in India will not continue in the long run. Though Coal Fired Power will be the primary source of Power but the Plants will not run at steady load. These units have to face wide variation in Load. But to run the existing Units are at varied Load a number of issues will surface.

Discussion

Member comments and replies

Members can ask questions, add practical observations and reply to earlier comments.

Add Comment
No comment has been posted yet.

Add a comment

Add a question, observation or field experience related to this case study.

Login to Comment